← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
Cottonwood 105-0523H
EOG Resources, Inc. · Mountrail County, ND · File #43508 · Generated 2026-11-27 02:13
- API
- 3306105737
- Target Formation
- Three Forks First Bench
- Permit Explained
- Yes
Permit Cycle Assessment
The permit is directly explained by referenced Commission Orders and specific, non-routine conditions tied to its geometry and execution plan.
Permit Cycle Signals (4)
Permit Information page, STIPULATIONS section
Unknown (Missing confidence)
Directly cites regulatory orders that define the unitized formation and setback requirements, conditioning the permit's validity.
Permit Information page, STIPULATIONS section
Unknown (Missing confidence)
A non-routine, geometry-specific modification to a standard setback rule, justified by a specific well construction and completion plan.
Page 2, Conditions of Approval
Unknown (Missing confidence)
A pre-construction regulatory touchpoint, indicating a specific inspector is assigned or that site-specific conditions require oversight.
Page 2, Conditions of Approval
Unknown (Missing confidence)
A specific, calculated geometric constraint tied to this well's long lateral length and trajectory, beyond generic requirements.
Historical Context (2)
Mission Canyon Formation is identified as a known H2S zone in the basin. An attached H2S plan is referenced.
Abnormal Conditions section of drilling plan · Unknown
Establishes an ongoing safety and operational hazard that must be managed during drilling and any future workovers.
All changes to casing point, total depth, or completion technique within the Bakken-Three Forks Petroleum System require prior NDIC approval.
Page 9, Operator Assertions · Unknown
Creates a persistent regulatory constraint on any future modifications to the well's design or completion, limiting operational flexibility.
Operator Pattern
Systematic unit development with long laterals.
Well is part of a multi-well pad (Ross 5 NWNE) targeting the Alger-Bakken Unit, with a lateral exceeding 16,000 ft. Comprehensive planning report and pad layout indicate coordinated development.
Confidence: High
The permit document explicitly contains the key regulatory orders and non-standard conditions that explain its approval. The file contains ample contemporaneous technical and planning documents supporting these conditions.