Cottonwood 21-0523H

EOG RESOURCES, INC. · Mountrail County, ND · File #43509 · Generated 2026-11-27 02:13

API
3306105738
Target Formation
Three Forks First Bench (B1)
Permit Explained
Yes

Permit Cycle Assessment

The permit approval is directly explained by stipulations referencing Commission Orders 35122/35123 defining the Alger-Bakken Unit, with specific setback conditions justified by the proposed cemented liner completion design. Supporting anti-collision review and log waiver requests are documented.

Permit Cycle Signals (4)

Approval is conditioned on well bore setbacks within the Alger-Bakken Unit (150' from N/S boundaries, 500' from E/W boundaries), justified by a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe.
Direct
Permit Information - STIPULATIONS section
2026-11-20 (Exact confidence)
Condition modifies standard setbacks for this specific unitized formation and cites specific wellbore construction (cemented liner, wet shoe) as justification.
Permit stipulates unitized formation definition from Commission Order No. 35122 & 35123 as the Alger-Bakken Unit (Bakken to Birdbear Formation).
Direct
Permit Information - STIPULATIONS and COMPLETION INTERVALS sections
Unknown (Missing confidence)
Defines the legal hydrocarbon target and spacing unit (14029-acre Alger-Bakken Unit) for which the permit is approved.
Operator assertion confirms review of wells within 500' of proposed wellbore and addressing of anti-collision concerns.
Supporting
OPERATOR ASSERTIONS section
2026-11-03 (Exact confidence)
Required pre-permit technical submission justifying safe drilling path, directly supporting permit approval.
Operator waiver request for Density/Porosity and Resistivity logs, requiring separate sundry notice.
Direct
GEOLOGIC INFORMATION - PROPOSED LOGS section
Unknown (Missing confidence)
Non-standard evaluation program requiring regulatory waiver, conditioning permit approval on separate formal request.

Historical Context (3)

Requirement for a covered, leak-proof, placarded container for filter sock disposal on-site from spud through flow-back, per July 29, 2026 letter.
July 29, 2026 letter 'RE: Filter Socks and Other Filter Media' · 2026-07-29
Imposes a persistent waste handling obligation for the entire drilling, completion, and flowback phase of this well.
Requirement to contact NDIC Field Inspector Dylan Roach prior to location construction.
Permit Information - 'Construction Commencement Notification' section · Unknown
Mandatory pre-construction notification that must be fulfilled before pad build-out.
Operator assertion: 'any changes...within the Bakken-Three Forks Petroleum System must have prior approval by the NDIC.'
OPERATOR ASSERTIONS section · Unknown
Establishes a forward-looking regulatory control point for any post-permit changes to casing points, TD, or completion technique.

Operator Pattern

Standardized unit development with multi-well pad planning and structured regulatory compliance.
Multi-well APD submission (Cottonwood 104, 18, 105, 21), standardized affidavit for all wells regarding no diesel in frac fluids, use of detailed, engineered plats and drilling plans.
Confidence: High
Permit document contains explicit stipulations citing Commission Orders and well-specific conditions. Supporting assertions and waiver requests are contemporaneous with the application. Historical signals are clearly dated or pertain to forward operational phases.