← Back to Daily Permits
OTHER
Wellfile updated - +1 pages
Cottonwood 21-0523H
EOG RESOURCES, INC. · Mountrail County, ND · File #43509 · Generated 2026-11-27 02:13
- API
- 3306105738
- Target Formation
- Three Forks First Bench (B1)
- Permit Explained
- Yes
Permit Cycle Assessment
The permit approval is directly explained by stipulations referencing Commission Orders 35122/35123 defining the Alger-Bakken Unit, with specific setback conditions justified by the proposed cemented liner completion design. Supporting anti-collision review and log waiver requests are documented.
Permit Cycle Signals (4)
Permit Information - STIPULATIONS section
2026-11-20 (Exact confidence)
Condition modifies standard setbacks for this specific unitized formation and cites specific wellbore construction (cemented liner, wet shoe) as justification.
Permit Information - STIPULATIONS and COMPLETION INTERVALS sections
Unknown (Missing confidence)
Defines the legal hydrocarbon target and spacing unit (14029-acre Alger-Bakken Unit) for which the permit is approved.
OPERATOR ASSERTIONS section
2026-11-03 (Exact confidence)
Required pre-permit technical submission justifying safe drilling path, directly supporting permit approval.
GEOLOGIC INFORMATION - PROPOSED LOGS section
Unknown (Missing confidence)
Non-standard evaluation program requiring regulatory waiver, conditioning permit approval on separate formal request.
Historical Context (3)
Requirement for a covered, leak-proof, placarded container for filter sock disposal on-site from spud through flow-back, per July 29, 2026 letter.
July 29, 2026 letter 'RE: Filter Socks and Other Filter Media' · 2026-07-29
Imposes a persistent waste handling obligation for the entire drilling, completion, and flowback phase of this well.
Requirement to contact NDIC Field Inspector Dylan Roach prior to location construction.
Permit Information - 'Construction Commencement Notification' section · Unknown
Mandatory pre-construction notification that must be fulfilled before pad build-out.
Operator assertion: 'any changes...within the Bakken-Three Forks Petroleum System must have prior approval by the NDIC.'
OPERATOR ASSERTIONS section · Unknown
Establishes a forward-looking regulatory control point for any post-permit changes to casing points, TD, or completion technique.
Operator Pattern
Standardized unit development with multi-well pad planning and structured regulatory compliance.
Multi-well APD submission (Cottonwood 104, 18, 105, 21), standardized affidavit for all wells regarding no diesel in frac fluids, use of detailed, engineered plats and drilling plans.
Confidence: High
Permit document contains explicit stipulations citing Commission Orders and well-specific conditions. Supporting assertions and waiver requests are contemporaneous with the application. Historical signals are clearly dated or pertain to forward operational phases.