๐ Regulatory Decision Signals
SWD authorization granted for directional injection well into Dakota Group with no public opposition or objections
Granted
Why Notable:Uncontested approval indicates regulatory confidence in application and absence of competing operator or surface owner concerns in Little Knife Field area
Commercial Relevance:Signals availability of disposal capacity in Dakota Group for Little Knife Field operators; absence of objections suggests limited stakeholder friction over injection siting
Director-signed authorization under NDAC ยง43-02-03-88.1 delegation authority
Granted
Why Notable:Order signed by Assistant Director on behalf of Commission, confirming delegation of SWD authorization authority to administrative level rather than full Commission hearing
Commercial Relevance:Indicates streamlined approval process for routine SWD applications, reducing timeline uncertainty for operators planning disposal infrastructure
๐ญ Operator & Well Intelligence
Wells:Tachenko #144-98-17-SWD
Target Formations:Dakota Group
Directional well drilling for disposal infrastructure optimization
Tachenko well drilled directionally from NW/4 NE/4 surface location to NE/4 NE/4 bottom hole location, indicating Petro-Hunt is managing multiple well locations or subsurface constraints within Section 17
Class II fluid disposal in exempted aquifer formation
Application targets Dakota Group documented to contain >10,000 ppm total dissolved solids, confirming operator strategy to utilize non-potable formations for produced water and waste injection
๐ผ Service Opportunity Signals
SWD
Near-term
New SWD well authorization for Petro-Hunt in Little Knife Field indicates active saltwater disposal demand requiring well drilling, completion, and ongoing injection management services
Why Relevant:Directional drilling and completion services needed for Tachenko #144-98-17-SWD well; ongoing monitoring and compliance reporting services required under NDAC Chapter 43-02-05 permit conditions
Drilling
Immediate
Directional well drilling service for SWD well with specified surface and bottom-hole locations requiring precision directional control
Why Relevant:Tachenko well requires directional drilling contractor capability; directional departure of approximately 413 feet horizontally suggests moderate deviation angle requiring experienced directional drilling services
โ๏ธ Regulatory Conditions & Stipulations
Requirement
Operator must receive and comply with all provisions of injection permit issued by Oil and Gas Division pursuant to NDAC ยง43-02-05-04 and all provisions of NDAC Chapter 43-02-05
Deadline: Ongoing
Requirement
Well construction must be designed to prevent movement of fluids into or between underground sources of drinking water
Deadline: Pre-drilling