COMPLETION
Completion: The permit is fully explained by UIC stipulations, pressure testing requirements, and conditional variances documented in the permit file.
Updated 2026-10-12 · was Aug 4, 2026 · Full diff →

DANNY NOONAN 1 SWD

Phoenix Operating LLC · Divide County, ND · File #42920 · Generated 2026-10-14 06:31

API
3302301801
Target Formation
Swift Formation (Dakota Group)
Permit Explained
Yes

Permit Cycle Assessment

The permit is fully explained by UIC stipulations, pressure testing requirements, and conditional variances documented in the permit file.

Permit Cycle Signals (3)

UIC Stipulation requiring impermeable liner for well site
Direct
Stipulations section
2026-05-11 (Exact confidence)
Direct regulatory condition tied to environmental protection
Pressure test requirement on injection pipeline prior to operation
Direct
Page 2 of 11
2026-05-11 (Exact confidence)
Safety and integrity verification for injection operations
Tank diking variance approval contingent on post-construction schematic submission
Direct
Page 3 of 11
2026-05-11 (Exact confidence)
Modified containment requirement with specific documentation trigger

Historical Context (2)

Geotechnical report confirming glacial till deposits provide groundwater protection
Braun Intertec Geotech Report · 2026-01-16
Persistent geological constraint affecting future pad construction and spill containment
Anti-collision modeling requirement for nearby directional wells
Drilling/Completion Program section · 2026-05-11
Ongoing operational safety requirement for pad development
Confidence: High
All permit conditions are explicitly documented with clear temporal ties to approval date. Geotechnical and operational constraints are well-defined.